Stock hanger.
After drilling pilot holes in the rivet heads they were sectioned in 4 pieces with a cut-off tool.
After this was done the heads were chisled off and the rivets were punched out using an air hammer. All in all a pain in the a$$.
Here's the new Western Chassis adjustable hanger. The lower holes provide a 2" drop and the top holes are a 3" drop.
Next up is the frame C-Section. Weeee !!!!
After drilling pilot holes in the rivet heads they were sectioned in 4 pieces with a cut-off tool.
After this was done the heads were chisled off and the rivets were punched out using an air hammer. All in all a pain in the a$$.
Here's the new Western Chassis adjustable hanger. The lower holes provide a 2" drop and the top holes are a 3" drop.
Next up is the frame C-Section. Weeee !!!!

